First load of siding arrives.


Siding is up all around to about eight feet. We start up from there when James gets back from London next Sunday.
Also we now have power to the building.








The man lift. We would never have accomplished what we did without it.


Golf course side of building.












The outline of the deck that will be attached at a later date. The deck roof will match the main structure.
I will be able to sit on the enclosed deck (NO BUGS) and watch the golfers go by.


Back of building (Shed Dormer allows 9 foot ceiling inside).








Garage side of building.




The only thing we were not able to accomplish (ran out of time) was the two dormers on the front of the building.
James is working on that today (8 September).

Updated 9 SEP 2018

Siding now all finished. The building looks totally different. Judy and I always wanted what we called a "seagull" house based upon the colors. This is it.








 